parking garage. >> good morning, steve lee with sfmta. the two items before you one is a lease for the japan center garage with the japan center garage corporation. and a lease with the uptown parking corporation for the sutter stockton garage. both of the general terms for both leases are essentially the same. they are 10-year leases for $1 and they both have two 5-year options to extend. a provision of termination for cause with a 90-day notice. both leases are updated to incorporate new provisions and that include sfmta facilities and management regulations, corporation employee hiring guidelines, and a change in the capital set aside from a percentage net income to an annual fixed amount. the japan center garage totaled 920 spaces and generates $4.2 million annually and accommodates 500,000 transient vehicles. the sutter stockton garage is 1 865 spaces on 12 levels. this garage generated l12.8 million annually and accommodated 500,000 transient vehicles annually. the japan center garage corporation lease, the current lease was entered into in 2002. the current lease expire
be annual payments from bart to sfmta and then we recommend that you approve that resolution as amended. regarding the fast pass agreement, 12 11 87, we recommend you amend the resolution to impose to reduce the cap from 14 million to 10.5 million for a reduction of 3.5 million. and then i would also point out that we did not recommend approval of that agreement. we say that approval is a policy matter as amended. >> thank you, mr. rose. and a few questions the clerk and city attorney understand that the file has already reflected the revised formula for corrected payment so we do not need to make that amendment ; is that correct? >> that's correct. >> okay. and, mr. rose, just in thinking about this, putting a 5% floor since the contract is based upon a cpi, assuming a 5% deflationary annual number, is that correct? this would be protective of deflation of 5% or more every year? >> that is [speaker not understood] for changes in rider ship. formula includes rider ship. >> thanks, okay. >> colleagues, any questions of the budget legislative analyst? thank you very much. appreciate your
as the director of the sfmta and right before my counterpart at bart [speaker not understood] started her tenure as the general manager there. at that time there were some concerns raised by the budget and finance committee and sent it to agencies back with some direction in terms of what they wanted to see including bringing both of these agreements together and then some specific provisions or at least guidance. when grace and i first assumed our respective duties in late 2011, we got together and this was one of the first things we talked about because even at that time these agreements were in arrears, what were past expiration. the two agencies were withholding payment from each other and we decided as the new kid on the block that we needed to get together, take heed of what the message and direction we got was from the board of supervisors and get these agreements done so that we can move forward. we fairly quickly were able to come to agreement in principle on the shape of these two agreements. and while i recognize and appreciate the intent of the board of supervisors to hear these two
. so, that is, that is what sfmta would look at going forward should we not reach some other type of reimbursement rate. so, and again, we anticipate taking a renewal of the fare increase program to our board, but as of yet we haven't taken it and they haven't acted on it. >> thank you very much. i was wondering if i could ask mr. rifkin just a follow-up question. and, again, i really appreciate all the work that's gone into this. i think it's great that we are where we are. i just think that, you know, there's some questions that remain. maybe you said this already and i apologize. but for the benefit of people who are here watching, where is the mta's payment with respect to the fast pass agreement? is that coming out of operating budget? >> these are all operating budget item. >> and how much more would -- or last, you know, would the mta be paying annually under the term of this agreement? >> i believe -- is it the fy '12? yeah. on the summary sheet, it's the information we provided, we'd be going on the fast pass from 7-8 to 9-1 for the last fiscal year. from about 2.6 to 2.7
construction in july of 2016. courtney will complete the presentation. >> the sfmta has requested 216,000 dollars in prop k funds. the detail request starts on page 59. cigna locations can be viewed of the map on page 71. the project will also include the installation of new pedestrian signals, signal controllers, conduit wiring, poles, new ramps. based on accident history, traffic volume, progression and benefits to users. the authority previously approved the scope of this project when it allocated prop k funds for the design phase for this project in 2010. the prop k funds will leverage -- federal highway fund and. sfmta dissipates this entire project will be completed in december 2013. sfmta has requested 720,000 in prop k funds to install signals and control boxes, and single pedestrian signals that 22 intersections along franklin street and divisadero street. on page 26 of your packet you can view the specific locations. 19 locations along franklin, 3 along divisadero. the conduit is going to be installed in coordination with the department up other works repaving proj
. this is my second time around as the capacity of sfmta and it is a pleasure to be here and served in the capacity some seven years ago and departed and became the directive of another agency in the central valley and i have been honored enough to be allowed to come back and serve in this capacity again. i want this body to know that we have heard many of the comments that were made today but both the public and the union. we certainly understand those comments and, we do not take them lightly. we have a significant purpose in this community, and we are working very hard to meet all of the needs of our riders daily. it is a complex, undertaking a balancing act, between operations and maintenance. providing service as a carrier of probably the largest number of persons per day in the bay area. so, i come here first and foremost to say thank you to this body for providing guidance and certainly funding for many of the projects that we undertake as we go forward. i also come to this afternoon i must do this to acknowledge my colleague, louis who and i go back over 20 years of service
bus rapid transit project to provide additional $208,862 in proeshted prop k funds to the sfmta bringing the sfmta's prop k budget to the total amount not to ex-see $349,362. >> is there any member of the public who would like to comment? >> seeing none, could we take the same in-house call. item passes. >> could you call number 8? >> appoint glen davis, aaron 2k3w0e8ds commission and christopher wadding to the citizen's advisory committee for two year terms. >> is is there any member of the public who would like to speak? >> seeing none, public comment is closed. the same house and call. >> same house and call item passes. >> number nine, recommend that cal train proceed with design of quint street bridge replacement option one, berm design allocate, $352,184 and prop k funds to the san francisco department of the public works for the conceptual design and environment review of the quint jerrioconnector road. >> and i do have a speaker card. labron is there any another member that would like to speak on this item please come forward. >> i have a presentation. >> there we go. >>
, working with sfmta, and the private sector as well. we're already looking at even better practices of picking up the garage earlier, getting the streets cleaner and making sure that we do everything to celebrate positively. everybody clean their house before chinese new year's. get rid of all the bad stuff that happened last year. [ laughter ] bring in the new spirit. this is the way to do it. as we celebrate and i am looking forward to not only a great new year's celebration, but something along the lines of some local football team that we want to celebrate as well [ applause ] thank you very much. [ applause ] >> thank you, mayor lee. and like the mayor said, when we work here in chinatown or in district 3 there is someone that is always there with us, whether it's the broadway streetscape improvement, or the many projects that go on polk street or all around the neighborhood, please ask supervisor david chiu to say a few words >> good morning everyone, happy new year and happy new year of the mini dragon. i want to thank the chinese community coming together for today's annou
. >> i think it was the sfmta [speaker not understood]. i think it was the sfmta's understanding that we would do this one time and then go forward from here it would be based on cpi. so, this agreement would take us to 2014 based on that formula. but i understand, i understand what you're saying. * there. for the feeder agreement, historically it's been based on a different methodology. when it was originally conceived in the mid 1980s, it was based upon the actual number of feeder trips that would [speaker not understood] at that point, multiplied by the net cost per passenger. and that cost per passenger was basically the total amount cost minus the fare revenue that we got. the budget and legislative analysts in their report last year calculated that would be approximately $15 million under that same methodology. in 1989, both parties agreed to -- at that point to transition over to a sales tax based methodology. and one of the issues there was that the sales tax methodology was easier to do because we could not count ridership. we didn't have any way of tracking that ridership elec
systems amongst our fairious departments, police, fire, port, the dpw, rpd and of course the sfmta 700 megahertz, am i correct, radio system? so, i want to make sure we're aligning all of these system so we have effective uses of funds and resources it so there is as much alignment as possible so that we have the savings that we need. so, i think those are the questions that continually come up for me. not the need to replace the system. i think the need is very, very clear and i'm happy to support this today. i just want to make sure that conversation continues and i'm glad that it started. these meetings, in the past six months, but i do really want some answers about how we're going to share on these facilities and leases and what it's going to take to improve these facilities to meet the needs of our city and our communication system. >> yes, i'll be interacting with the mda and other departments. in fact, this particular project, we are recommended that the transportation agency co-locate their system, the bd system, thereby they share the existing fiber, existing wireless, [speak